Wastewater Advisory Committee to MWRA (WAC) |
|
Return to WAC Main Page | Meeting Schedule | Minutes | Presentations | Documents of Note | WAC on Tour This page is an archive of presentations to the Wastewater Advisory Committee to the MWRA (WAC). 2020 |2019 | 2018 | 2017 | 2016 | 2015 | 2014 | 2013 | 2012 | 2011 | 2010 | 2009 | (2008) | 2007 | 2006 |
|
2020 Update on MWRA Energy Program MWRA FY21 Proposed CEB and CIP Presentation for WAC and WSCAC Low Temperature Thermal-alkaline Hydrolysis Process for Biosolids and Organics Management - Lystek Activities for Children and Adults - BWSC Partnering To Bring Stormwater Education In and Out of the Classroom - MWRA Education division What Can We Do To Protect The Environment? - BWSC 2019 CSO Post Post-Construction Monitoring and Performance Assessment User-Friendly Ways to Communicate MWRA’s Environmental Data Per and Poly Fluoroalkyl Substances (PFAS): Why all the Fuss? What Do We Know about PFAS in MWRA Water, Wastewater and Biosolids? Cottage Farm CSO Facility Tour MWRA Fiscal Year 2020 Proposed Budget Update on the 2018 Water and Wastewater Master Plan 2018 CSO Post-Construction Monitoring and Performance Assessment Year in Review: Toxic Reduction and Control Reducing Flooding and Combined Sewer Overflows, Improving Water Quality, and Restoring Ecological Flows with Continuous Monitoring and Adaptive Control Leave Mark Greater Lawrence Sanitary District Organics to Energy Project Proposed FY 19 Comments and Recommendations Preview FY19 Proposed Capital Improvement Budget MWRA Long-Term CSO Control Plan Performance Objectives Deer Island NPDES Permit NPDES Delegation Infiltration and Inflow Control Update on MWRA's Community Support Program Indicator Bacteria Deer Island Disinfection and Dilution at Deer Island Outfall Protect Mass. Bay Deer Island Treatment Plant Valve and Piping Replacements Fiscal Year 2018 Proposed Capital Improvement and Current Expense Budget Overviews The Cost of Water Infrastructure: Implications for State Policy and Municipal Budgets Wastewater Pipeline Inspection and Maintenance Coordinating Infrastructure for Construction Boston's Planning for Green Stormwater Infrastructure Boston Harbor Now MWRA's Pragmatic Approach to Climate Change Climate Change in Massachusetts and Its Impact on River Flood Behavior MassDEP’s Surface Water Monitoring Program MWRA's Water Quality Monitoring Program, Mystic and Charles Rivers FY 2017 Proposed Captial Improvement and Current Expense Budgets MWRA CSOs: Performance Assessment and Remaining Regulatory Determinations MWRA Reservoir Water Withdrawals vs Deer Island Wastewater Flows Comparison of 2014 Flows Preparing for MS4 in the Neponset Valley A Tale of Two Treatment Plants: MWRA/Deer Island vs. DC Water/Blue Plains What's In It? A Discussion of the Development of Pollutant Limits and Contaminants of Emerging Concern Proposed MWRA CEB/CIP New England Water Innovation Network Municipal Stormwater Planning, Innovations, Outreach and I/I Removal Presentation to MWRA Advisory Board and WAC - Valve and Piping Replacements, Deer Island Treatment Plant (MWRA Contract 7275) January | February | March | April | May | June | July | August | September | October | November | December Existing and Future Combined Heat and Power (CHP) at the Deer Island Treatment Plant Organics Ban Implementation in Massachusetts - Evolving Infrastructure Alewife CSO Control, Sewer Separation and Stormwater Management Project Fiscal Year 2015 Proposed Capital Expense Budget and Current Expense Budget Going Green, Staying Green: MWRA’s Energy Initiatives MWRA’s Pragmatic Approach to Climate Change Adaptation Impacts to the Sewer System from Disposal of Rags and Wipes January | February | March | April | May | June | July | August | September | October | November | December 2013 MWRA Master Plan Wastewater Pipeline Asset Management and Protection Pellet Plant Tour (photos and video) Fiscal Year 2014 Proposed Capital Improvement and Current Expense Budget Overviews Smart Growth plus Sewer Collection Equals Smart Sewering Co-Digestion at Deer Island: A Feasibility Study on a Major Green Energy Initiative Hurricane Preparations Before and After Sandy January | February | March | April | May | June | July | August | September | October | November | December
January | February | March | April | May | June | July | August | September | October | November North System Hydraulic Study Long-Range Residuals Planning Wastewater System Update FY 2012 Current CEB and CIP Overviews BWSC - CSO and Stormwater Project Update Operations Maintenance Updates Effluent and Shellfish Monitoring Results 2009 Sediment Studies in Massachusetts Bay Water Column Monitoring Results for 2009 November | October | (September) | (August) | (July) | (June) | (May) | April | March | February | January North Dorchester Bay CSO Project Update Remote Headworks Upgrade Sanitary Sewer Overflows: Response to EPA Rule Making Impacts of March Storms CSO Control Plan Progress in 2009 MWRA's Renewable and Sustainable Energy Initiatives MWRA Toxic Reduction and Control (November) | (October) | September | (August) | (July) | June | May | (April) | (March) | February | (January) Presentation to a joint meeting of WAC, WSCAC and the Advisory Board: Challenges Ahead VIDEO: Time-lapsed Construction of MWRA Wind Turbines at Deer Island Field Operations Department Wastewater Operations and Maintenance Update Wastewater Advisory Committee Proposed FY 2010, Current Expense and Capital Improvement Budget Overviews Deer Island Treatment Plant Facilities Asset Management Program 20 Years of Change: Boston Harbor Recovers Sediment and Flounder Studies in Boston Harbor MWRA FY07 Accomplishments and FY08 Challenges Climate Change: What We Know and What We are Learning Briefing - MWRA Master Plan South Boston CSO Reassessment Updated June 8, 2020 |